Hi all, Some of my simulations run with a time step of 2 fs and 'constraints' set to 'none'. Everything runs perfectly fine, but with such a time step, do you usually set constraints to 'h-bonds'? I know I should be looking at literature for this, but just wanted to get a basic idea on whether people do this. Thanks, Alex